Project Description

Project Features

  • Facilitated Commerce RI Renewable Energy Fund Grant and US Department of Agriculture Energy Program Grant incentives 
  •  Designed, Installed, and Commissioned 67 KW Solar Facility (20 KW Roof Mount + 47 KW Ground Mount) for 100% Net Zero energy usage 
  • Facilitated Net Metering Interconnection with National Grid 

Services Provided

  • Technical Feasibility Assessment
  • Project Management
  • Town Building Codes and Planning Board Project Permitting Processes
  • Site Civil Engineering & Planning
  • Building Roof Structural Engineering
  • Mechanical Design Engineering
  • Electrical Design Engineering
  • Material Procurement and Delivery Logistics
  • Site Excavations
  • Pre-Cast Concrete
  • Equipment Assembly and Installation
  • Electrical Interconnections
  • System Commissioning, System Utility Interconnection
  • Equipment Warranty Services 