Project Description
Project Features
- Facilitated Commerce RI Renewable Energy Fund Cash Grant
- Designed, Installed, and Commissioned 10 KW Roof Mounted Solar Facility for 100% Net Zero energy usage
- Facilitated Net Metering Interconnection with National Grid
Services Provided
- Technical Feasibility Assessment
- Project Management
- Town Building Codes and Planning Board Project Permitting Processes
- Site Civil Engineering & Planning
- Building Roof Structural Engineering
- Mechanical Design Engineering
- Electrical Design Engineering
- Material Procurement and Delivery Logistics
- Equipment Assembly and Installation
- Electrical Interconnections
- System Commissioning
- System Utility Interconnection
- Equipment Warranty Services